Malankara dam shutters opened for major repair works

[anap_hero_image fallback=”https://th-i.thgim.com/public/incoming/ml855b/article71002614.ece/alternates/LANDSCAPE_1200/80759_20_5_2026_18_42_53_1_MALANKARA_DAM05.JPG”]

The Hindu

Malankara dam shutters opened for major repair works

Malankara dam shutters opened for major repair works Maintenance works include replacing shutter screws and installing new rubber sealsUpdated – May 20, 2026 11:01 pm IST – IDUKKIK. Sasi Kumar The shutters of Malankara dam in Idukki were…

India
May 20, 2026

[anap_share_buttons]

Malankara dam shutters opened for major repair works

Maintenance works include replacing shutter screws and installing new rubber seals

Updated – May 20, 2026 11:01 pm IST – IDUKKI

K. Sasi KumarThe shutters of Malankara dam in Idukki were opened for major repair works on Wednesday.

The shutters of Malankara dam in Idukki were opened for major repair works on Wednesday.
| Photo Credit: H. VIBHU

The shutters of the Malankara dam, under the Muvattupuzha Valley Irrigation Project (MVIP), have been opened to facilitate major repair work.

According to an MVIP official, the dam’s water level must be lowered to 36.9 m for the maintenance to begin. To achieve this, water distribution through the project’s canal networks was suspended on Wednesday, and four spillway shutters were fully raised. The water level has currently dropped to 40 m.

“The repair work will commence once the reservoir hits the 36.9-m mark. The maintenance is estimated to take about two weeks, though it could be completed slightly ahead of or after the scheduled time frame,” an official said.

The maintenance works include replacing the shutter screws and installing new rubber seals. “Our objective is to complete these major structural repairs before the arrival of heavy monsoon rain,” the official added.

The Malankara dam primarily stores tailrace water released into the Muvattupuzha river from the Moolamattom powerhouse after electricity generation at the Idukki reservoir. With the Malankara shutters wide open, this water can no longer be impounded and will flow directly downstream into the Muvattupuzha river. Officials noted that the drawdown and subsequent discharge are also likely to temporarily hit power generation at the Malankara small hydroelectric project.

Published – May 20, 2026 08:06 pm IST

[anap_related_posts]

  • Related Posts

    Punjab government to remove stray dogs from high footfall public spaces following Supreme Court order

    Bhagwant Mann said the government will create and maintain an adequate number of dog shelters where stray dogs can be properly cared for

    Rajasthan Cabinet approves new industrial development policy with focus on talent economy

    Industries and Commerce Minister Rajyavardhan Singh Rathore told journalists after the meeting that the new policy would provide incentives to micro, small, and medium enterprises, one district one product, and…

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    You Missed

    Rajasthan Cabinet approves new industrial development policy with focus on talent economy

    Punjab government to remove stray dogs from high footfall public spaces following Supreme Court order

    Public hearing for limestone mining called off in Meghalaya after protest

    Bengal CM on first visit to Delhi after taking charge, meets President, Prime Minister and Home Minister

    Elected government has no role in Jammu demolitions, says Farooq Abdullah

    Woman sustains injury at Kochi metro worksite